
Altona Tunnel: 55-hour closure of the A7
Work on the expansion of the eight-lane A7 motorway and the construction of a new noise protection tunnel on the Altona section is underway. The next step will involve removing the last structural component of the viaduct, which means the motorway has to be closed.
According to information provided by Autobahn GmbH, the A7 motorway will be completely closed from 20:00 PM on Friday, June 7, until 5:00 AM on Monday, June 10.
❌ southbound carriageway, between the intersections HH-Stellingen (26) and HH-Heimfeld (32),
❌ northbound carriageway, between the junctions HH-Heimfeld (32) and HH-Volkspark (27).
Diversion routes:
During the closures through and local traffic in both directions will be diverted along the A1, A21 and B205 motorways, and information for drivers will be displayed on VMS panels.
❌ traffic from the south from the Buchholzer triangle (43) / Horster triangle (40), through Maschener Kreuz (39), then along the A1 motorway.
❌ Drivers are advised to avoid Hamburg. Traffic from the from the north, should follow along the B205 from the Neumünster-Süd junction (15).
Latest Posts
Double Closure of the A12 in the Netherlands: Traffic Jams and Detours to Paralyze Transport
The Dutch A12 motorway, one of the key routes for international transport, will be completely closed twice in 2025. Each closure will last for 9 consecutive...
Hungary: No traffic ban during the night before May 1st! Trucks can operate until Thursday morning
This is important news for those planning routes through Hungary before the long May weekend. The night from April 30 to May 1 will be open for trucks – the...
Spain temporarily extends driving time for truck drivers after massive power outage
The Ministry of Transport and Sustainable Mobility in Spain has approved a temporary regulation that relaxes the rules on driving time and rest periods for...