Altona Tunnel: 55-hour closure of the A7
Work on the expansion of the eight-lane A7 motorway and the construction of a new noise protection tunnel on the Altona section is underway. The next step will involve removing the last structural component of the viaduct, which means the motorway has to be closed.
According to information provided by Autobahn GmbH, the A7 motorway will be completely closed from 20:00 PM on Friday, June 7, until 5:00 AM on Monday, June 10.
❌ southbound carriageway, between the intersections HH-Stellingen (26) and HH-Heimfeld (32),
❌ northbound carriageway, between the junctions HH-Heimfeld (32) and HH-Volkspark (27).
Diversion routes:
During the closures through and local traffic in both directions will be diverted along the A1, A21 and B205 motorways, and information for drivers will be displayed on VMS panels.
❌ traffic from the south from the Buchholzer triangle (43) / Horster triangle (40), through Maschener Kreuz (39), then along the A1 motorway.
❌ Drivers are advised to avoid Hamburg. Traffic from the from the north, should follow along the B205 from the Neumünster-Süd junction (15).
Latest Posts
Italy: HGV driving ban on the A22 on October 26
In response to the HGV driving ban on October 26 (Saturday) connected with the Austrian national holiday, the Italian province of Bolzano has introduced a...
Italy: HGV driving ban on the A22 on October 26
Tirol: traffic restrictions on the Lueg Bridge in 2025
In cooperation with the local authorities, the ministry and partners, ASFINAG has prepared a detailed schedule of traffic measures on the Lueg Bridge, which...
Tirol: traffic restrictions on the Lueg Bridge in 2025
Update! Austria: exit bans on the A10 motorway to prevent traffic jam avoidance
The measure has been introduced at selected junctions of the A10 motorway in order to prevent through traffic on local roads adjacent to the motorway, which...